boat rescue operation with great effort failed
the installation of the manipulator fell, the crane operator almost died
With the wind and operator error, the crane used in construction fell to the place of the houses.
The operator, who tried to lift the prefabricated buildings in the construction area, dropped the guard box due to clumsiness.
The truck crane that wanted to lift the crane walking on the rails fell over with its load
Another crane was assigned to lift the counter-rotating crane, but when the ropes of the crane to be rescued broke, it rolled downhill.
The shop selling basic foodstuffs and beverages crashed to the ground as a result of a crane error while moving the shop to a more busy...
The crane used in the construction was overturned by the effect of the extreme wind.
As a result of the crane operator’s mistake, the crane lifting the electric pole fell to the ground
ship cranes overturned due to balancing problem
The crane that fell due to the unstable crane position of the crane operator, The captain who rented a crane to launch , smashed the yacht.
When the crane operator, unloading a heavy load, set the vehicle platform unstable, the crane turned upside down
The strong and strong wind blowing in Kazakhstan, Astana, took down the construction crane. The crane fell into the building used as a warehouse.
The crane fell into the sea with the fishing vessel while the fishing vessel was lifted by a crane, which was intended to be taken ashore...
A large crane fell on the building due to strong wind. No dead or injured
It may be a crane accident, but knowing that the winch will tip over, lifting the power pole is difficult to understand